2025 – New 115,850 sq. ft. Galvanization Plant in the Drummondville Industrial Park
Design and construction of an industrial complex to house the new facilities of Galvanisation Québec. This major project aims to provide the company with state-of-the-art infrastructure to support its growth and strengthen its position among Canada’s industry leaders.
Project objectives:
- Equip Galvanisation Québec with a cutting-edge galvanizing plant;
- Maximize automation and production line performance;
- Support the expansion of operations nationwide;
- Create over 100 skilled jobs in the Centre-du-Québec region.
Key technical components:
- Building designed to accommodate a high-capacity galvanizing process, including the largest dipping tanks in North America;
- Heavy industrial structure adapted for overhead cranes and the handling of oversized parts, fully automated;
- Custom mechanical and electrical systems designed to support a high level of automation;
- Integrated administrative areas and logistics spaces within the main building;
Optimized design for operational durability and energy efficiency.
Specific challenges encountered:
- Close coordination with specialized industrial equipment suppliers from abroad;
- Strict compliance with environmental standards and metallurgical industry requirements;
- Construction of a building tailored to a highly specialized industrial process, requiring custom design that meets complex structural, foundation, and workspace criteria and tolerances.